Gary headed back to Krabi on Wednesday (04/09), via Bangkok to do some shopping (shopping without me L).
The floor tiling is all done - inside and out. The bathroom tiling is basically finished - probably just tidying up when all the fittings go in. All the rendering on the outside and inside is complete and the paint colours have been chosen and ordered and hopefully finished by the time Gary's ready to come home, so I can see and share more pics. Some of the windows and doors were being fitted when he was at the site on Friday. They do things differently there, putting the doors and windows in after a lot of the other stuff has been done. All the bathroom fittings have been ordered but I'm not sure if they've been delivered yet.
Here's some of the photos he took. I think it's looking great.
front of the house from the road |
front entry |
looking into the kitchen |
steps from outside dining to side of the house
front entry from inside the house
looking to the front door. Dogs are in the lounge
looking into the kitchen
back of the house. looking from door way of master bedroom to lounge kitchen area.
master bathroom
looking from master bedroom across to outside dining
master bedroom bay window
lounge room looking across to kitchen. through the door at the end is the study
from the master bedroom
lounge room
from the dining room looking across to the master bedroom
from the dining room. if we decide not to get the pool put in, that hole will make an excellent garden :-)
from the outside dining looking into the kitchen
looking out to the outside dining
Will share more when Gary sends through more pictures.
Looks fantastic. Which one is my room?
ReplyDeleteLuuv Ange xx